Sign In

TNI - ChiTietDuAn

​Minh Quang industrial zone is established under Document No. 1159 / TTg-CN dated August 21, 2007 of the Prime Minister on the addition of Minh Quang Industrial Zone in planning development of industrial zones in Vietnam and Decision No. 542 / QD-Committee dated February 04, 2008 of hung Yen people’s Committee on approval for the detailed planning with ratio: 1/200 Minh Quang Industrial Zone, My Hao district, Hung Yen province.

Area: 150 hectares.
Location: My Hao district, Hung Yen province.
Investor: VID Hung Yen Joint Stock Company.
Duration: to 2058.

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Area
Planning area​
​150 heactares
Area available for rent
114 hectares leasable
Zoning map
https://www.google.com/maps/dir///@20.9266596,106.1176754,2
671m/data=!3m1!1e3

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

The infrastructure
​Roads​
Internal roads: 28m
Other road: 24m in width
​Electrical​
​Two sub-station newly equipped transformer 110kV – capacity of 120 MVA
​Water​
The water supply system is connected to the fence to take each business.
Contact Info​
​Telecommunication systems and international standards are always ready to meet the communication needs​
Garbage disposal​
​N/A
Wastewater
IP will continue to be processed in accordance with standards of the Government of Vietnam.
​Finance
Maritime Bank, Vietcombank  Chi nhánh Hưng Yên, ACB, Agribank, Techcombank ...
​Training School
​Hung Yen province has 15 Vocational training schools
Housing for workers​
Residential workers, housing specialists and managers​
Fire protection​​
​Supplied and fully equipped​
Green tree system
Green tree system accounts about 10-12% of the total area of ​​the Industrial Park
Land condition
​– Elevation: 6.5m above the sea

– Soil quality: hard and leveled

Drainage system
Rainwater drainage system and waste water system (industrial wastewater and domestic sewage) are built separately. Rainwater is collected through drain system and drain into thr rivers in the area. Wastewater is collected to the wastewater treatment plant of the zone.
​Other gadgets​
All customs procedures will be implemented in Hung Yen Customs

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Cost
Rents do not have the infrastructure
​Extra land fee to Government​
​The rental facilities
Ready-built warehouse, logistics
Electricity prices
EVN Hung Yen
Water Rates
15000 VND/m3
​Labor costs
Zone 2 - 250 USD ++ 
Solid waste disposal fee
​N/A
Wastewater treatment fee
​Level A: from 0.15 USD/m3
Level B: from 0.45 USD/m3 ... (VAT excluded)
Management fee​
0.5 USD/m2/year
Other expenses


Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Status
​​In operational
from 2018
Fill rate​​
​60%
​Investment Incentives​
​support from TNI Holdings

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Construction management
1. Building density:
​​60%​
​​2. Maximum height
​​13m - 3 floors
​3. Backwards space
​​Main road: 10m
Branch road: 7m
​​4. Fence
​​– The maximum height of fence along the car road is 2.3 m

– Barriers between the lots is not higher than 2 meters and not using barbed wire​

​​5. Fire protection system and lightning roads​
​​Maintaining an effective fire alarm and fire suppression system for each building at the site.
Any structure within the lot must be equipped with a lightning rod of a suitable design.

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn

Information of Hung Yen Province

​​1. Area
926 km2
​2. Population
1.252.731​ people
​3. Labor forces
60% of population in working age
4. GRDP
​​65,746 bil Vnd
​5. Total registered FDI capital (as of 2020)​
​​$4.3 bil
​6. PCI Index (2018)​
63.41

Hotline: +84 971 375 888 / +84 981 873 666

Email: sale@roxliving.vn